WELDLESS & Q-WELD SEAFASTENING SYSTEM

Stop wasting your time and money by using the MobiDeck seafastening system (Patented). Cut down on cost increase your efficiency and dramatically cut mobilization time up to 60%. With our field-tested seafastening system we can enable your mobilization to become a safe and lean experience with a higher HSE level.

DECKPLANNER

A new generation of software for offshore vessel operations.

Visit deckplanner.co for optimal planning.

Q-WELD SEA FASTENING

Save 50% of your time at quay and up to 70% of welding using the MobiDeck Seafastening System with Quick-Weld. The only weld to plan for is to structure in deck. All brackets are pre-configured and ready to be welded. Fully adjustable in any direction correct alignment with solid structure is easy.

WELDLESS SEAFASTENING

The MobiDeck Seafastening System is designed to be adapable. Interface with any deck struture. For vessels with fixed securing points on deck the MobiDeck Seafastening system is the adaptor, enabling you to have a more flexible decklayout.

SERVICE

We provide a full seafasteing service. We are onsite for all mobilization activites. All the way until the unit is secured on deck and ready for operation.

ASSEMBLE AND FIT SEAFASTENING ON QUAY OR IN THE WORKSHOP BEFORE THE VESSEL ARRIVES

Our system enables your units to be lifted with the sea fastening attached.

LESS WELDING- BOLTED CONNECTIONS AND FULLY ADJUSTABLE

With our Q-Weld system is fully adjustable to any deck variations.  The Q-Weld bracket can be adjusted horizontally and vertically.

LESS LIFTS - ENABLE THE MULTI-UNIT LIFT CAPABILITY

With MobiDeck seafastening system you can lift one or more units. The seafastening is attached, all in one lift. No more lifting of seafastening beams and units onto deck in multiple separate lifts. Less lift means less hazards and a safer place to work.

UNLEASH THE DE-MOBILIZATION POTENTIAL

Remove the bolts on the Q-Weld brackets  and you can start lifting your equipment off the vessel. This enables you to start the de-mobilization before the hot-work team is ready. This way it is possible to clear the deck for equipment and the hot-work team can work faster and safer removing the welding brackets.

RE-MOBILIZATION

If you plan to swap or change some unit mid-operation, you can plan for no hot-work. Loosen the clamps securing a container and lift off the vessel. Reposition the bracket too fit the new unit, and lift it aboard onto the frame without any hot-work.

Breimyra 18, 4344 Bryne

+47 900 25 283

Denne e-postadressen er beskyttet mot programmer som samler e-postadresser. Du må aktivere javaskript for å kunne se den.

Org no: 916 583 923